D.G. Mace Construction
Marblehead MA ~ Established 1978 ~ DG.MaceConstruct@gmail.com
Friday, September 27, 2013
Before and after on Waterside Rd Marblehead 2012
Thursday, September 26, 2013
Second Floor New Bathroom
A second floor half bath was needed and a dormer required to do so.
My artistic client had this antique tub refinished and new fixtures installed.
New Bathroom
This was the last room we did on a large remodel on Waterside road in Marblehead. The shower floor and shower seat were made with small beach stones.
‹
›
Home
View web version