9/23/10 Stripping Shingles & Rake Added On Front Of House. Autumn St., Lynn
Today, we spent the first half of the day stripping all the old shingles off of the rest of the roof. The boards on this side were in much better condition than the other, so we didn't have to replace many. Here's Pig Pen & Bill finishing up.
The carnage.
Any time we strip a roof, we take time to make sure all things in the area are properly protected and covered. We laid tarps out and covered the neighbors cars with tarps, drop cloths and 4x8 sheets of plywood.

The carnage.Any time we strip a roof, we take time to make sure all things in the area are properly protected and covered. We laid tarps out and covered the neighbors cars with tarps, drop cloths and 4x8 sheets of plywood.

Wednesday, September 22, 2010
9/21/10 - 9/22/10 Finished The Roof On One Side, Flashed The Chimney & Added Some Soffit. Autumn St., Lynn
Bill stripped the trim off of the little roof out front, replaced some boards, added ice & water shield and now it's ready for shingles.
We staged the other side of the house. So now we have to take off the gutter and rip off all the trim up top.
Tomorrow we are going to remove all the shingles from the other side, rip off all the trim and start rebuilding!
Monday, September 20, 2010
9/20/10 Stripped Some More Roof & Replaced Some More Trim - Autumn St., Lynn
We started the day by taking the tarps off the roof and stripping the rest of the shingles off the side of the house we have staged.
We set up this amazing 1960's electric ladder so we can easily bring up the bundles of shingles to the roof.
At the end of the day after replacing the old, rotting boards on the roof, we covered the exposed roof so no moisture can get in.
We set up this amazing 1960's electric ladder so we can easily bring up the bundles of shingles to the roof.
At the end of the day after replacing the old, rotting boards on the roof, we covered the exposed roof so no moisture can get in.
Friday, September 17, 2010
9/8/10 - 9/16/10 New Roof, New Trim & 2 New Decks on Autumn St., Lynn Ma.
We were hired to remove and replace all the rotten the rotten trim, remove 3 layers of old roof shingles and re-roof..well, the roof and then remove and re-build 2 decks in the back of the house. aka a BIG job! We're replacing all the rotting trim with the composite material that will never rot. Sharp as heck, but well worth it.
8/10 - Removed & Replaced Lots of Rotting Trim On Lehman Rd, Marblehead, Ma.