Friday, September 27, 2013



Before and after on Waterside Rd Marblehead 2012

Thursday, September 26, 2013

Second Floor New Bathroom



A second floor half bath was needed and a dormer required to do so.
My artistic client had this antique tub refinished and new fixtures installed.

New Bathroom


This was the last room we did on a large remodel on Waterside road in Marblehead.  The shower  floor and shower seat were made with small beach stones.